Plano TX: Road construction updates

City of Plano road construction updates
13TH/14TH CONNECTOR – G Avenue to US Hwy 75
WB 13th/14th Connector will be closed from G Avenue to US Hwy 75 daily from 9 a.m. to 4 p.m. for paving replacement.
Estimated completion date is 7-10-20

ALDRIDGE DR – Edgefield Dr to Westwood Dr
Aldridge Dr will be one way eastbound from Westwood Dr to Edgefield Dr for water line and paving installation.
Estimated completion date is 7-31-20.

ALMA DRIVE – PGBT to Hedgcoxe
Replacing buttons and reflectors on Alma Rd from PGBT to Hedgcoxe Rd. One lane northbound and southbound will be closed from 9 a.m. to 4 p.m.
Expected completion date is 7-10-20.

ALMA DRIVE – Parker Rd to Park Blvd
One lane northbound will be closed during the week. Additional southbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs.
Expected completion date is 8-1-20.

ALMA DRIVE – Parker Rd to Park Blvd
One lane southbound will be closed during the week. Additional southbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs.
Expected completion date is 10-1-20.

COIT ROAD and HEDGCOXE ROAD INTERSECTION – Carmichael Dr to Elliot Dr.

The outside SB lane along Coit Rd and the outside WB lane along Hedgcoxe Rd will be closed during the week. The lanes will be closed 9 a.m. to 4 p.m. for screening wall repairs.
Expected completion date is 9-07-20.

COIT ROAD – Matterhorn to Parker Rd
One lane northbound will be closed during the week. Additional northbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs.
Expected completion date is 7-17-20.

COIT ROAD – McDermott to Hedgcoxe
One lane southbound and northbound will be closed during the week. Additional southbound and northbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs. Expected completion date is 8-01-20.

COIT ROAD – Wyeth Dr Rd to Spring Creek Pkwy
One lane southbound and northbound will be closed during the week. Additional southbound and northbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs. Expected completion date is 8-11-20.

COIT ROAD – Bonita Dr to Malton Dr
The outside lane of NB Coit Road will be closed from Bonita Drive to Malton Drive will be closed during the week. Northbound lanes will be closed 8 a.m. to 5 p.m. for screening wall repairs.
Expected completion date is 7-10-20.

COMMUNICATIONS PARKWAY – Winthrop St to Headquarters
The outside lane of NB Communications Parkway will be closed from Winthrop St to Headquarters daily from 9 a.m. to 4 p.m. for paving operations.
Expected completion date is 7-31-20.

CUSTER ROAD and Plano Parkway
Various lanes at the intersection of Custer Road and Plano Parkway will be closed for construction of a double left turn lane northbound and southbound.
Expected completion date is 7-10-20.

DALLAS NORTH TOLLWAY FRONTAGE ROAD – Spring Creek Parkway to Windhaven Parkway
The outside lane of SB Dallas North Tollway Frontage Road will be closed daily from 9 a.m. to 4 p.m. from Spring Creek Parkway to Windhaven Parkway for paving installation. Estimated completion date is 7-10-20.

DOBIE DRIVE – East of Avenue K at Park Blvd
Dobie Drive at Park Blvd will be permanently closed for paving operations. Eastboound Dobie Drive can be accessed from Avenue K.
Estimated completion date is 7-10-20.

FERNWOOD DR – Edgefield Dr to Westwood Dr
Fernwood Dr will be one way eastbound from Westwood Dr to Edgefield Dr for water line and paving installation.
Estimated completion date is 7-10-20.

GLENWICK DRIVE – Edgefield Dr to Westwood Dr
Glenwick drive will be one way eastbound from Westwood Dr to Edgefield Dr for water line and paving installation.
Estimated completion date is 7-10-20.

HEDGCOXE ROAD – Independence Parkway to Bent Tree Springs Drive
One lane eastbound and one lane westbound will be closed during the week. Additional eastbound and westbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs. Expected completion date is 7-10-20.

HEDGCOXE ROAD – Bent Tree Springs Dr to Coit Rd
One lane eastbound and one lane westbound will be closed during the week. Additional eastbound and westbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs. Expected completion date is 8-21-20.

INTERSECTION IMPROVEMENTS – Park at DNT, Parker at DNT, Alma and Spring Creek Pkwy
Right turn lane(s) construction on northbound and southbound Dallas North Tollway and Parker Road started on July 10th.
Expected completion date is 7-17-20.

JUPITER ROAD – Park Blvd to 18th Street
One lane southbound and one lane northbound will be closed during the week. Additional southbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs.
Expected completion date is 7-17-20.

LEADERSHIP DRIVE – Headquarters drive to SH121 Service RoadThe outside lane of NB Leadership Drive will be closed from Headquarters Drive to SH121 Service Road for turn lane installation.
Estimated completion date is 7-3-20.

LEGACY DRIVE – Harvey Lane to Rochelle Drive
The outside lane of WB Legacy Drive will be closed from Harvey Lane to Rochelle Drive for screening wall installation.
Expected completion date is 7-31-20.

LEGACY DRIVE – Tracy Road to Harvey Lane
The outside lane of WB Legacy Drive will be closed from Tracy Road to Harvey Lane. Northbound lanes will be closed for screening wall repairs.
Expected completion date is 8-19-20.

MIDWAY ROAD – Parker Rd to Windhaven – Northbound Intersection of Parker and Midway will be closed 9 a.m. to 4 p.m. for concrete repairs.

MUNICIPAL AVE – 14th to 15th Street
Various southbound lanes will be closed during the week. Additional southbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs.
Expected completion date is 7-3-2020

PARKER ROAD – Coit Rd to Preston Meadows Dr
One lane eastbound and one lane westbound will be closed during the week. Additional eastbound and westbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs. Expected completion date is 7-17-20.

PLANO PARKWAY at Custer Road
Various lanes at the intersection of Custer Road and Plano Parkway will be closed for construction of a double left turn lane northbound and southbound and a dedicated right turn lane for westbound.
Expected completion date is 7-10-20.

PLANO PARKWAY – Winding Hollow to Ventura Dr
One lane eastbound will be closed during the week. Additional eastbound lanes will be closed 9 a.m. to 4 p.m. for concrete repairs.
Expected completion date is 7-15-20.

PREMIER DRIVE – Parker Road to Spring Creek Parkway
One lane northbound and one lane southbound will be closed during the week. Additional lanes will be closed 9 a.m. to 4 p.m. for concrete repairs.
Expected completion date is 7-31-20.

PRESTON ROAD – Old Shepard Place to President George Bush Turnpike
The Southbound outside and middle lane will be closed from Old Shepard Place to President George Bush Turnpike for bridge expansion.
Expected completion date is January 2021.

RIGSBEE DRIVE – 14TH St to 18TH Street
The northbound lane is closed on Rigsbee from 18th St. to 14th St. for street paving construction.
This phase of the project is expected to last until 8-30-20.

WESTWOOD DRIVE – 15th Street to Janwood Drive
Existing SB Westwood Drive will be closed from 15th Street to Janwood Drive for water line and paving installation. Traffic will be rerouted to two way traffic on existing NB Westwood.
Expected completion date is 7-31-20.

West SPRING CREEK PARKWAY – Service Roads
W. Spring Creek Parkway service roads from Blue Ridge Trail to Alma Drive will be closed in phases for construction of water line replacement, drainage improvements and pavement replacements.
Expected completion date is 7-10-20

Source: City of Plano Texas.

Frisco ISD orchestras earn high rankings

Orchestra programs from all Frisco ISD high schools took performing groups to the UIL Region 24 Orchestra Concert and Sight Reading Evaluation and brought home a number of superior and sweepstakes rankings.

All 10 Frisco ISD high schools were recognized for their performances.

At the UIL Orchestra Concert and Sight Reading Evaluation, orchestras first performed a concert of three pieces that the students and their directors had been preparing for weeks. From the concert, the students went straight to sight reading.

During the sight reading evaluation, the director was provided three minutes to study a score before instructing students through a piece they had not previously prepared for. During the seven to 10 minutes of instruction, the director could not perform the music on any instrument, tap rhythms or perform any part of the music in any fashion. No sounds were permitted until it was finally time to perform for a panel of judges.

If the director chose to, the students could play a quick scale or long tone before performing the sight reading music. The students were then judged on the performance of the piece upon their first time to ever play it.

Frisco ISD: Congratulations goes to Lebanon Trail, Liberty, Lone Star, Memorial, Reedy and Wakeland high schools, which had all of their orchestras receive a Sweepstakes designation.

Centennial
Sweepstakes with Varsity, Non-Varsity, Sub Non-Varsity A, and Sub Non-Varsity B
Superior rating in Concert with Sub Non-Varsity C

Frisco
Sweepstakes with Varsity
Superior rating in Concert with Non-Varsity

Heritage
Sweepstakes with Varsity Full, Non-Varsity, and Sub Non-Varsity A
Superior rating in Sight Reading with Sub Non-Varsity B

Independence
Sweepstakes with Varsity Full, Non-Varsity, and Sub Non-Varsity A
Superior rating in Concert with Sub Non-Varsity B

Lebanon Trail
Sweepstakes with Varsity Full, Non-Varsity, Sub Non-Varsity A and Sub Non-Varsity B

Liberty
Sweepstakes with Varsity Full, Non-Varsity, Sub Non-Varsity A, Sub Non-Varsity B and Sub Non-Varsity C

Lone Star
Sweepstakes with Varsity and Non-Varsity

Memorial
Sweepstakes with Varsity and Non-Varsity

Reedy
Sweepstakes with Varsity, Non-Varsity, Sub Non-Varsity A, and Sub Non-Varsity B

Wakeland
Sweepstakes with Varsity and Non-Varsity

Women in Theatre Festival in downtown Plano at Courtyard Theatre – July 16-21

CollinCountyMagazine.com supports local arts, music and stage productions. Share this local event in Plano with your social media and follow us at @collincountydfw

#theaterjones

Belly dancing Sunday at Plano Event Center at Holistic Festival of Life and Wellness @visitPlano

The Event in Plano will feature holistic health and yoga all day Sunday, June 24 at the Plano Event Center at 2000 East Spring Creek Parkway Plano TX 75074. There will additional belly dancing presentations on Sunday. See schedule at Holistic Festival of Life dot com

CollinCountyMagazine.com

@collincountydfw

%d bloggers like this: